"Take every precaution to prevent interference with utilities. The Contractor is solely responsible for damage to or interference with the utilities and for the cost of protecting the utilities from such damage or interference."
> Open Specification Document
Call: 811 (Local) or 888-721-7877
Click: https://sc811.com/