New Mexico Specifications & Guidelines

New Mexico Department of Transportation

NMDOT Standard Specifications for Highway and Bridge Construction, 2019 Edition

709.3.1 Rigid Electrical Conduit, Construction Requirements, General

"... Where wire is not installed, a tracer wire must be installed for line locating.
When trenching, the Contractor shall place caution tape one (1) foot above the conduit. ..."

> Open Specification Document

Call Before You Dig

New Mexico One Call, Inc.

Call: 811 (Local) or 800-409-2132

Click: https://www.nm811.org/

Product Approvals

Copyright © 2025 Damage Prevention Solutions, LLC
3M Authorized ManufacturerMade in USA of US and Imported Parts